tencent cloud

Tencent Cloud DataBuddy

Quick Start for Ops Engineers

다운로드
포커스 모드
폰트 크기
마지막 업데이트 시간: 2026-10-09 16:08:56
AI 번역
Note:
Estimated duration: 90 minutes. Learning objective: Using the Ops scenario of a production data pipeline as an example, run through the complete Ops pipeline end to end, from platform preparation → alarm and retry configuration → real-time monitoring → failure rerun and historical backfill → root cause analysis → usage and capacity management.

Scenario Introduction

You are an Ops engineer who has just joined the data platform team. The team is responsible for supporting an e-commerce order ETL workflow that runs daily at 00:00. Your daily work includes:
Grant workspace permissions to new colleagues.
Configure alarm and automatic retry policies once in the production workflow to avoid missed alerts.
Receive alarms immediately when a task fails in the early morning, and locate the failed task within 5 minutes to decide whether to rerun it or backfill data.
Quickly locate root causes through logs and intelligent diagnostics, and create a review that can be shared with upstream and downstream teams.
This tutorial walks you through the complete workflow, with all paths aligned to the Platform Management, Workflow, and Workflow Run modules in the workspace.

Prerequisites

Before starting this tutorial, make sure the following prerequisites are met:
You have activated the DataBuddy service and completed workspace initialization.
The current account has the Workspace Member role in the target workspace.
You have at least one published and daily scheduled workflow. You can use the quickstart_orders_etl workflow produced in Data Engineer Quick Start. This workflow should have execution records for at least 7 days in Workflow Run to demonstrate historical trends and data backfill.
You have prepared an email address and a WeCom group bot (or a Slack/Teams Incoming Webhook URL) for receiving test alarms.

Tutorial Scenario

The main Ops scenario in this tutorial:
Scenario
Description
Workflow
quickstart_orders_etl, runs daily at 00:00 and contains two tasks: sync_mysql2dlc and pyspark_transform.
Channels for receiving alarms
Team email data-ops@example.com + WeCom group bot.
Fault injection test
Intentionally stop the upstream MySQL instance temporarily to make sync_mysql2dlc fail; after recovery, practice rerunning + backfilling data.

Step 1: Adding Members and Assigning Space Roles

When a new colleague joins, the first step is to add them to the workspace and grant appropriate permissions based on their responsibilities.

1.1 Adding a CAM Sub-Account to the Console

1. Log in to the DataBuddy console, and choose User Management > Users in the left navigation pane.
2. Click Add User and select the sub-account to add.
3. Console Role: Select Console Member for all users (can only access workspaces they are added to and cannot create new workspaces).
4. Click Add to complete the addition.
Note:
Only CAM sub-accounts can be added to DataBuddy. If the target account is not found in the drop-down list, create it in the CAM console first. For details, see Member and Permission Management.

1.2 Inviting Members to the Target Workspace and Assigning Roles

1. Go to the target workspace, and choose Workspace > User Management > Users in the left navigation pane.
2. Click Add User to add the user from the previous step to the workspace and grant them the workspace member role, which has full read, write, and delete permissions except for workspace management.
3. Click **Add** to complete the addition.

Step 2: Configuring Alarm Notification Channels

Notification channels are workspace-level alarm outlets, and all entities that support alarms (workflows, tasks, data quality rules, and so on) share these channels.
1. Go to Workspace > Notification Management.
2. Click Add Notification Channel and configure the following two channels in sequence:

2.1 Configuring Email Channels

Parameter
Value
Type
Email
Name
email_data_ops
Address
data-ops@example.com (Separate multiple email addresses with line breaks or half-width commas; line breaks are not supported).
Click Add to save.

2.2 Configuring an Enterprise IM Channel (Webhook / Slack / Teams, Choose One)

Take a WeCom group bot as an example. Use the Webhook type:
Parameter
Value
Type
Webhook
Name
webhook_wechat_ops
URL
Incoming Webhook URL generated by the group bot on WeCom
Username / Password
Leave empty in general and configure according to bot-side rules.
If your team uses Slack / Teams, create an Incoming Webhook on the corresponding platform first, and then select the corresponding type in DataBuddy and enter the URL. For details, see Configure Notification Channels.
Note:
Notification channels are workspace-level configurations and are not shared across workspaces. To use the same channel in multiple workspaces, configure it separately in each workspace. Before deleting a channel, make sure it is not referenced by any alarm rules. Otherwise, alarms that reference the channel cannot be sent after deletion. After an email channel is configured in a workspace, it cannot be directly referenced for alarms. You need to manually enter it in the alarm channel.

Step 3: Configuring Alarms and Retries for Workflows

Attach the notification channel configured in the previous step to the workflow, and then add an automatic retry for critical tasks.

3.1 Configuring Workflow-Level Alarms

1. In the left navigation pane, select Workflow, and click quickstart_orders_etl to go to the workflow details page.
2. In the Monitoring Metrics area, click Add monitoring metrics:
Metric: Running Duration.
Warning Threshold: 01h00m00s (The tutorial workflow normally completes within 10 minutes. If it runs for more than 1 hour, it is considered abnormal).
Timeout Threshold: 02h00m00s (If the duration exceeds 2 hours, a retry on failure is triggered or the task is marked as failed).
1. Configure alarms in **Alarm Configuration**:
Receiving Channel: Click Add Channel, select Personal Email, and enter the email address of email_data_ops in the input box. Select Webhook and choose webhook_wechat_ops.
Alarm Conditions: Select Failure (selected by default and required) + Monitoring Metrics (used for timeout alarms).
Do Not Disturb: Select Manual Termination (no alarm is sent when a task is manually terminated, preventing false alarms for on-call personnel).
1. Click Confirm to save.

3.2 Configuring Automatic Retries for Critical Tasks

1. Go to the workflow, select the Task Orchestration tab to enter the Workflow Editor canvas, and click the sync_mysql2dlc task node in the canvas.
2. In the task configuration panel, locate Failure and Timeout Policy:
Parameter
Recommended Value
Description
Retry after Execution Failure
On
Automatically recover when network jitter occurs or the upstream is temporarily unreachable.
Behavior after Timeout
Trigger Retry
-
Maximum Number of Retries
3
Mark as failed if retries fail three times.
Retry Interval
5 minutes
Allow sufficient time for the upstream to recover.
1. Click Confirm.
Note:
Task-level alarms and workflow-level alarms do not interfere with each other: We recommend that you configure overall failure and overall timeout alarms at the workflow level, and add task runtime, wait time, and completion time alarms at the key task level to implement layered alerting. For details, see Workflow and Task Alarms and the Failure and Timeout Policy section in General Task Configuration.

3.3 Triggering an Alarm for Verification

To verify that the alarm chain is working properly, you can manually trigger a failure:
1. In the workflow editor, temporarily switch the data source of sync_mysql2dlc to a non-existent MySQL instance.
2. Click Run at the top of the workflow.
3. You should receive alarm notifications in the email_data_ops mailbox and the WeCom group within 1–2 minutes.
4. After validation is complete, return to the task configuration, restore the original data source, and save.

Step 4: Tracking Execution Status During Workflow Runs

After a workflow goes live, daily Ops is mainly performed in the Workflow Run module.

4.1 Viewing the Run List to Quickly Identify Exceptions

1. In the left navigation pane, choose Workflow > Workflow Run.
2. In the filter bar at the top:
Workflow Name: Enter quickstart_orders_etl.
Start Time: The default is the last 3 days, and it can be adjusted to up to the last 60 days.
Run Account: You can filter by run account.
1. The chart area at the top of the list displays:
Run Quantity Trend: Displays the number of runs in each state grouped by time.
Error Code: Click an error code to filter the run instances with that error code.

4.2 Status Lifecycle (Key Comparisons)

Workflows and tasks have two independent state machines. We recommend that you familiarize yourself with the following high-frequency states:
Workflow Run Status:
Status
Description
Available Operations
Pending
Workflow queuing
Terminate
Running
At least one task is running.
Terminate
Successful
All tasks have reached the final state without any failures.
Rerun, Delete
Failed
All tasks have reached the final state and at least one has failed.
Rerun, Delete
Terminating
Terminating
-
Task Run Status (12 in total, 6 common):
Status
Description
Troubleshooting tips
Waiting for Upstream
The upstream task has not reached the final state.
Check the upstream status first.
Waiting for Resources
Waiting for Scheduling or Engine Resources
Check the computing resource load and CU quota.
Running
Task running
-
Retry upon Failure
Waiting for automatic retry after failure
Check the interval set in **step 3.1**.
Failed
Final state, task failed.
Go to root cause analysis **(step 6)**.
Upstream Failed
Upstream failure causes downstream tasks to be skipped.
Fix the upstream first, and then determine the rerun scope for the downstream.
For the complete status mapping, see Workflow and Task Run Monitoring.

4.3 Switching Between Three Views to See Run Details

Click any Run Stream ID to go to the run details page. You can switch between tabs in the upper-left corner:
View
Scenario
Graph mode (DAG)
View the status color of each task node at a glance: green/red/blue/gray/yellow.
List mode
Display the run ID, type, duration, compute resources, and source file path of all tasks in a table, and support sorting by column.
Gantt chart
Arrange the start and end time range of all tasks along a horizontal timeline, best suited for identifying long-running tasks and concurrency bottlenecks.
Three typical scenarios for using Gantt charts to identify bottlenecks:
A single task bar is too wide: This indicates a long-tail task. Check whether it can be split or run with increased concurrency.
Multiple tasks are connected end-to-end but could run in parallel: The dependencies are redundant. Go back to the workflow editor to adjust them.
Large gaps appear between tasks: They are caused by waiting for resources or upstream tasks. Pay attention to the Wait Duration metric.

Step 5: Rerunning Failed Tasks and Backfilling Historical Data

The core action of troubleshooting is to repair failed instances and backfill their data.

5.1 Rerunning the Current Failed Workflow Run

1. On the workflow run details page or at the end of a run list row, click Rerun.
2. In the pop-up window:
By default, all failed nodes are selected in the DAG diagram. Hold down Shift and click nodes to adjust the selection range.
Parameter: The parameter values used for the current run are filled in by default and can be adjusted.
1. Click Run to trigger a rerun.
Scenario
Recommended Action
Downstream rerun after upstream fix
Select "Failed Tasks + Their Downstream Tasks" in the DAG.
Partial rerun after single-task code fix
On the task run details page, directly click Rerun and select only the current task.
Rerun from scratch due to configuration error
In the workflow run list, click Rerun and select all tasks in the DAG.
Note:
A rerun uses the latest task code and configuration. When dependencies change, the button is grayed out, and hovering over it displays a message stating that task dependencies in the workflow have changed and rerun is not supported. In this case, create a new workflow run instead of rerunning a historical instance. For more information, see Ops operations for workflows and tasks.

5.2 Backfilling Data for Historical Dates (Advanced Run)

When historical data is missing (for example, when scheduling is newly launched or the last 3 days of data need to be redone), use Advanced Run to trigger runs separately by date:
1. In the workflow details page action bar, click Advanced Run.
2. In the pop-up window:
In the DAG diagram on the left, all nodes are selected by default. If you only need to backfill specific tasks, click nodes to deselect them.
In the Parameter Configuration section on the right, change the business date in the workflow parameters (for example, dp_data_dt) to the target historical date 2025-01-13.
You can also click + Add Parameter to add temporary parameters, which take effect only for the current run.
1. Click Run to submit once.
2. Repeat the previous steps to submit the dates that need to be backfilled in sequence, such as 2025-01-14 and 2025-01-15.
Note:
Workflow scheduling in DataBuddy is triggered at the workflow run level. Backfilling is essentially manually triggering N runs with specified parameters. If the scheduling frequency is once per day, submit 3 runs for 3 days of backfilling. If the frequency is hourly, backfill at an hourly granularity. For more information, see Ops operations for workflows and tasks and system built-in parameters.

5.3 Terminating Abnormal Runs

Operation
Entries
Action
Terminate a single run
End of the run list row Terminate
Terminate only this run (available for running / waiting / failed retry states)
Terminate all
Operations bar on the workflow details page
Terminate all runs of the current workflow (including running and waiting), with a second confirmation
Terminate all waiting runs
Operations bar on the workflow details page
Terminate only runs in waiting state and protect running instances.

Step 6: Root Cause Analysis (Identifying Causes)

After receiving an alarm, follow the process below to locate the root cause. This section uses the failure of the pyspark_transform task as an example.

6.1 Going to the Task Run Details Page

1. In Workflow > Workflow Runs, find the failed instance and click its Run ID to go to the run details.
2. In Graph Mode, click the red node pyspark_transform to go to the task run details page.
The task run details page provides three tabs and one button:
Tab/Button
Scenario
Tab-Execution Result
Task code and outputs
Tab-Running Log
Error codes, error messages, and full logs (most important)
Tab-Task Insights
Performance metrics such as cumulative CPU time, scanned data volume, Shuffle, and output row quantity
Button-Spark UI
Access Spark native UI to inspect operator-level details.

6.2 Reading Logs in Three Stages

Switch to the Run Logs Tab and check the following three types of information in order:
Phase
What to Look For
Waiting for Upstream
Dependencies and status of upstream tasks
Waiting to Run
Resource queuing status and scheduling logs
Task Running
Error code (such as RESOURCE_* / PERMISSION_* / DATA_* / CONFIG_* / TIMEOUT_*) + full error stack + submitted task code
Tips:
Use the Search box to locate keywords (Error / Exception / error codes).
The Auto Wrap toggle allows long stack traces to be viewed on a single screen.
Use Download Logs to take the complete logs off the platform for use with your internal knowledge base or ticket submission.

6.3 Quickly Identifying Fault Types with Intelligent Diagnosis

hover over a DAG node or click AI Diagnosis on the task run details page. For more information, see Intelligent Diagnosis for Tasks.

6.4 Emergency Handling Reference for Fault Classification

Error Code Prefix
Typical Scenario
Emergency handling
RESOURCE_*
Insufficient resources, CU queuing, Driver OOM
Temporarily scale out compute resources; optimize Spark executor.memory and shuffle.partitions
PERMISSION_*
Missing Permissions for Data Source/Catalog
Check the ACL in Data Source Management or Data Catalog, and apply for permissions if necessary.
DATA_*
Missing Upstream Data / Format Error
First check the upstream data source and confirm the data backfill link.
CONFIG_*
Parameter/SQL Syntax Error
View the submitted code and parameters in Run Results on the task details page; collaborate with developers to make modifications.
TIMEOUT_*
Task Timeout
Check whether the timeout threshold in Monitoring Metrics is reasonable, and optimize the code or increase the threshold if necessary.

6.5 Using Data Lineage for Impact Analysis

If the failed task has downstream workflows, go to the details page of the table to which the failed task belongs (DataLakeCatalog.wedata_demo_db.quickstart_amazon_orders) and switch to the Lineage Tab:
List mode: Quickly lists the first-level upstream and downstream dependencies of the current table.
Graph mode: View from a topological perspective who else on the entire chain will be affected.
For more information, see Data Lineage.

Verification Result

After completing all steps, you should be able to confirm:
1. Members and Roles: analyst_alice is a workspace member, and ops_bob is a workspace administrator. The user group data-ops-team can be managed in batches.
2. Notification Channels: Both email_data_ops and webhook_wechat_ops appear in the Notification Management list and have received at least one test alarm.
3. Alarms and Retries: Workflow-level failure alarms and monitoring metric alarms have been attached to channels. The failure retry policy for the sync_mysql2dlc task is 3 times × 5 minutes.
4. Rerun and Backfill: You can use Rerun to fix a single failure, or use Advanced Run to backfill data for 3 days by date.
5. Root Cause Analysis: You can locate error codes, read key stack traces, and identify fault categories within 5 minutes on the task run details page.

Summary

In this tutorial, you have completed:
In the workspace, onboard new members and assign permissions based on the workspace role + ACL two-layer model.
In Notification Management, integrate email and IM channels to achieve a unified outlet and cross-scenario reuse.
Configure alarms, automatic retries, and monitoring metric thresholds at both the workflow and task levels.
In Workflow Runs, become proficient in using the three views: DAG / List, and Gantt chart, and understand the 12 task states.
Use Rerun and Advanced Run to fix failures and backfill historical data.
Use the run logs, intelligent diagnostics, and data lineage toolkit to locate root causes and create a review document.
This end-to-end Ops pipeline covers more than 80% of the high-frequency daily operations for Ops/SRE roles. You can further explore advanced capabilities such as real-time data ingestion task Ops, data quality blocking pipelines, CI/CD pipelines, and metering and billing control.

도움말 및 지원

문제 해결에 도움이 되었나요?

피드백